A winter lighting trail is designed to capture the imagination and take visitors on a magical journey through an immersive experience. However, every illuminated feature, catering unit and operational area has a power requirement that needs to be carefully planned. Temporary power for a lighting trail must be focused on the visitor experience. Equipment should be discreet, noise should be considered and cabling planned appropriately. It’s important to work with a temporary power company that specialises in large-scale events to design and engineer a robust and sustainable system.

This article explains the key considerations you need to be aware of if you are planning a winter lighting trail. Paul Ilsley, Operations Manager at Flow Power Solutions answers organisers usual questions around power for Christmas light trails, winter events and Halloween attractions during Autumn and Winter. His advice starts with a simple principle, understand the whole event before specifying the equipment…

What temporary power does a lighting trail actually need?

The installations are the most visible power demand, but they are only one part of the load jigsaw. Large scale lighting trails also need power for entrance areas, car parking, festoon lighting, food and beverage outlets, merchandise points, site offices and welfare, storage areas, back-of-house lighting and Wi-Fi equipment used by vendors.

Importantly, those requirements will not all follow the same programme. For example, decorative lighting features can be switched on before opening so the production team can walk the route and check each installation. It can then be switched off after the final visitors leave. Whereas refrigeration, communications equipment or operational cabins may need a continuous supply, especially if night security is a requirement.

That difference matters when we design and engineer the system. If you approach the project assuming that everything runs for 24 hours a day, it can lead to increased costs. A useful first step is separating the event into show-time loads, set-up and close-down loads, and continuous loads.

Start with a site plan and the lighting specifications

“The first thing we need to understand is the load profile. What needs power during the show, what needs it overnight, and where each installation sits. That’s what allows us to engineer an optimal system rather, rather than simply just supplying generators.”

To design the most efficient and effective distribution system, we would need a specification of the lighting products, information about the additional infrastructure and a site plan. The site plan helps answer the practical questions like how far apart are the installations? Where are the catering areas? Which paths must remain open, and Where can generators and fuel equipment be delivered, positioned and accessed during the event?

At this stage, we don’t need a perfect plan. We often work with event organisers to develop this out and suggest value engineering improvements. Sharing an early layout gives the power team a chance to identify generator placements, cable runs, and distribution board positions before the creative design is fixed.

For an established trail, last year’s layout is a useful starting point. Not necessarily to repeat an unchanged design but to evaluate what worked well and where efficiency improvements can be made. We can use our expertise to look at repositioning equipment, reducing the number of generators or improve the way power is distributed across the event.

Where is best to position generators for winter events

Generator placement is absolutely fundamental and it affects much more than the length of a cable run. A generator positioned close to an installation may be convenient from an electrical perspective. However, it can detract from the visitor experience if it is visible or introduces noise into a quieter section of the trail.

Paul explains,

“The aim is to draw visitors’ attention towards the lighting, not towards the equipment powering it. That may mean positioning generators away from the approach to an installation.”

There is no universal rule that every installation needs its own generator. Equally, placing the entire trail on one package will not suit every site. The right approach depends on the spread of installations, available access, cable routes and noise sensitivity.

For example,  if five lighting features sit together along a route, then we will consider if it can be served by one discreetly positioned packages rather than five individual generators.

Plan cable routes effectively

Lighting trails often run through parks, gardens, country estates attractions with established paths. Lighting trails are a popular way to drive commercial opportunities in the typically quieter winter months and capture crowds during the busy Christmas period. Temporary power has to reach installations across those spaces, sometimes while the site remain in public use during installation. This creates its own challenges but Flow have the technical expertise and equipment, in-house to manage it…

Organisers need to understand which paths will be crossed, where equipment can be kept away from visitors and how routes will work for people using wheelchairs, mobility aids or pushchairs. Where a cable must cross a public route, a suitable low-profile, DDA accessible cable ramp may be needed. Flow Power Solutions can provide cable ramps as part of the event power distribution package.

A site walk is particularly valuable here. A drawing can show the shortest route between a generator and an installation; it may not show how that route interacts with a busy path, a vehicle access point or the visual setting of the trail. Flow can provide a complete cable and distribution package, in addition to mobile power.

Powering the Northern Lights in Manchester

Flow Power Solutions were the official temporary power supplier to the Northern Lights, a spectacular winter event held at Heaton Park in Manchester. The event features a stunning, 1-mile walking trail with around 16 illumination zones, plus a Christmas Village for food & drink vendors. The event is a premium experience that attracts around 100,000 visitors annually. Flow supplied a fully engineered temporary power package, including:

64 distribution boards

5.4km of cabling

8 Generators ranging from 20 kVA to 100 kVA

20,500 litres of fuel

1.6km festoon lighting

“The Northern Lights trail is a significant event for us with a clear focus on quality and high production values. It was absolutely essential for us to work with a contractor that understands this and the attention to detail, energy and effort, we put into the event. The Flow Power Solutions team were selected as they demonstrated the very same values that we hold”

Katie Vine Managing Director – Engine No4

Resilience and fail-safe systems for continual temporary power in winter

A power failure does not have the same impact everywhere on a lighting trail. Losing one decorative installation may be disappointing, but a power failure across a long section could leave visitors in darkness, with significant reputational and commercial consequences.  Resilience is part of our design and engineering approach. There are several ways to build resilience into a temporary power design. Separating loads can limit the area affected by a fault. We also design a standby generator or another appropriate backup arrangement for additional protection. 

How can you reduce generator noise on a Christmas light trail?

Sound is part of the experience. A generator that would be barely noticeable at a busy outdoor show or music festival may be intrusive beside a quieter winter installation. 

The first response is thoughtful placement. Moving equipment away from visitor routes and sensitive areas can make a substantial difference to how the event feels. That decision needs to be made alongside cable routing and access for operation and refuelling. 

Battery energy storage systems (BESS) can also be considered as part of a sustainable and quitter power design. Paired with our energy efficient generators, it means as the generators run for fewer hours, reducing noise and fuel use. Once the battery is charged from the generator, the generator acts as a backup power source. 

Sustainable temporary power

Discover how Flow Power Solutions wide range of sustainable temporary power products can help drive down your event’s carbon footprint 

Planning power requirements through the day and night

A lighting trail’s busiest electrical period is not necessarily its only important one. Once the show closes, catering operators may still need refrigeration. Site offices, storage or communications equipment may also remain in use. 

For example, as the event organiser, do you need to make provision for carpark lighting, security lighting and communications equipment through the night.  You can also ask each supplier what power needs they have. Catering is a good example as the power demand from serving hot food may end after the last visitors leave, while a fridge containing perishable stock must continue running 24/7.  

Back-of-house areas also need attention. Cabins and working areas may require lighting during set-up, operation and close-down. If these needs are omitted from the initial brief, they can become awkward additions once generators, distribution boards and cables have already been positioned. 

Mapping operating hours alongside electrical requirements helps the power provider propose a system that supports the whole event without running every part of it unnecessarily. 

lit up architecture in pink lighting

Can the same power approach work for Halloween and Christmas events?

Yes, we have seen a big growth in the Halloween event market with scare mazes, pumpkin farms and Theme parks increasing event programmes around these increasingly popular trading events. The creative and production elements change, but many of the power-planning questions are similar. A Halloween attraction may have illuminated features, catering, visitor routes and temporary operational areas, just as a Christmas trail does. 

For venues that host both, there may be an opportunity to review whether elements of the temporary power infrastructure can be retained, repositioned or repurposed between events to drive efficiency.  

A full-service partner for winter activations

Flow Power solutions are part of the GL events Group who provide a wide range of event activation solutions from marquees and temporary structures to the actual illuminated lighting products themselves giving you a complete event delivery solution from a single partner.  

Related Post

How to plan temporary power for winter lighting trails 

How to plan temporary power for winter lighting trails 

Reliable temporary power for winter lighting A winter lighting trail is designed to capture the imagination and take visitors on… Read more

Feeling the heat? How to manage emergency AC hire

Feeling the heat? How to manage emergency AC hire

Restore comfort with a quick call to Flow There is never a good time for your air conditioning system to… Read more

Cabling for temporary event power: Keeping you safe

Cabling for temporary event power: Keeping you safe

Large– scale events require a significant amount of cabling for temporary event power. Safe cable management is key to a safe… Read more